# you already pay power plants to stand ready

*a capacity payment buys reliability from a machine with a switch. the watershed above the reservoir has no switch, and no payment*

A **capacity payment** is money paid to a power plant, or to a customer who can cut demand, for being able to deliver electricity when the grid is short, whether or not it runs. It pays for standing ready. Grid operators buy it years ahead, and in the markets below a resource that fails to deliver when called pays a penalty.

If you pay an electric bill in PJM's market, part of it buys that readiness. PJM says wholesale capacity "accounts for a relatively small portion of retail electricity bills," and [data centers and your electric bill](/guide/data-centers-and-your-electric-bill?from=guide) follows that portion to a household.

A plant is not the only thing that has to stand ready. The watershed above a hydro reservoir keeps doing its work whether or not anyone pays for it, until the year it can't. **ensurance** is one way the money and care that keep it going get paid for. It is not insurance and pays nothing after a loss ([ensurance vs insurance](/guide/ensurance-vs-insurance?from=guide)).

:::johnson
**a capacity payment buys a promise a machine can keep.**

A plant can be called, measured and penalized. A watershed can only be kept in condition before the bad year.

[see the utility view →](/solutions/utilities?from=guide&topic=continuity)
:::

![photo by Dan Meyers (@dmey503) on unsplash](https://images.unsplash.com/photo-1560279966-2d681f3d4dfc?ixid=M3w4NjQwMjZ8MHwxfHNlYXJjaHwyfHxoeWRyb2VsZWN0cmljJTIwZGFtJTIwZm9yZXN0fGVufDB8MHx8fDE3OTU1NTYyNDh8MA&ixlib=rb-4.1.0&w=1200&fit=crop&auto=format)

## what a capacity payment pays for

PJM calls its capacity market the Reliability Pricing Model and describes it as securing enough supply ahead of time to meet predicted future demand. Its Base Residual Auction "procures power supply resources in advance of the delivery year," usually three years ahead.

It does not buy nameplate. PJM counts unforced capacity, or UCAP, which "represents a generation resource's maximum output adjusted for its estimated ability to reliably perform at times of highest system risk." Customers who agree to cut demand clear the auction beside power plants.

The target is a planning standard: a loss of load expectation "of one occurrence in ten years," in the words of PJM's 2026 reserve requirement study. The system is planned to run short about once a decade, not never.

## the newest auction, in numbers

PJM released its 2028/2029 results on July 14, 2026. Supply and demand response cleared at the FERC-approved cap again, 2.5% below the previous cap.

| delivery year | results released | cleared (MW) | price ($/MW-day) |
|---|---|---|---|
| 2025/2026 | July 30, 2024 | 135,684 | 269.92 (much of the footprint) |
| 2026/2027 | July 22, 2025 | 134,311 | 329.17 (cap) |
| 2027/2028 | December 17, 2025 | 134,479 | 333.44 (cap) |
| 2028/2029 | July 14, 2026 | 138,318 | 325.00 (cap) |

The 2024/2025 auction had cleared at $28.92.

The telling number is the gap. The 2028/2029 auction came in 6,831 MW short of PJM's reliability requirement, after a 6,623 MW shortfall the auction before. PJM says these were the first auctions in its history in which the whole region fell short, and adds that a shortage "does not necessarily mean that the PJM system will be unable to serve load reliably in the delivery year; it means that PJM would have to operate with slimmer reserves and a greater level of risk."

## why markets pay for standing ready

Peter Cramton, Axel Ockenfels and Steven Stoft state the case for paying for capacity plainly, in 2013: "During rolling blackouts, essentially every generator is running, so all are paid the same high scarcity price. Typically, the price is capped too low. That means there is "missing money," which implies too low a level of investment in capacity." Most customers, they add, cannot or do not respond to real-time prices.

Their paper names two fixes: "(1) raise scarcity prices paid during blackouts (price-based approach), and (2) pay every supplier of capacity the same amount per MW of capacity (quantity-based approach)." A capacity payment is the second.

## how the promise is enforced

ISO New England's Pay for Performance rules, in effect since June 1, 2018, pay each supplier its monthly capacity payment, then settle again on what it delivered during scarcity. An ISO New England briefing from March 2023 states the rule: "resources that did not supply enough electricity or reserves to meet their capacity supply obligation are required to compensate the resources that made up the difference."

PJM's rules were tested in Winter Storm Elliott, December 23 to 25, 2022. Non-performance charges ran to about $1.8 billion. On December 19, 2023, FERC approved a settlement that resolved 15 complaints and cut the total to $1.25 billion, a uniform 31.7% reduction, according to PJM's settlement FAQ. The charges fund bonus credits for resources that did perform.

A capacity payment buys a promise with a penalty behind it. It does not buy a guarantee.

## when the fuel is water

Colombia buys readiness against drought. Its reliability charge held its first firm energy auction in 2008, according to a 2019 World Bank working paper. Generators "receive a stable reliability payment" and commit to deliver set energy at a fixed price "during tight supply conditions (i.e. dry hydrology)." One that falls short buys the difference on the spot market. In the 2015 to 2016 El Niño, the paper reports, spot prices spiked to 822 USD/MWh and not all generators were ready; it also records no rationing in 2015.

Water has its own version. In Metropolitan Water District of Southern California's 35-year Palo Verde program, begun in 2005, "farmers are paid to refrain from irrigating between 7 and 28 percent of the valley's land at Metropolitan's call." The 2004 draft term sheet provided a one-time sign-up payment of $3,170 per acre of a landowner's maximum commitment, plus $602 per acre fallowed in a given year.

Each of these pays someone who can answer a call. The water comes from somewhere else. In 2021, the U.S. Energy Information Administration reports, California's hydropower generation was 48% below its 2011 to 2020 average, in a year when the April 1 Sierra Nevada snowpack was 41% below normal.

## reliability is what the customer gets

Reliability is the lights on at 6 p.m. in January and water at the tap in the third dry year. From a machine you can buy it with a contract and a penalty, because a plant can be dispatched.

A power plant has a switch. A watershed has a condition.

Nobody can call a forest at 6 p.m. in January. What can be funded is its condition before the bad year, so that it is still there and still working when the bad year comes.

We call that **continuity**. It is our word, not an industry term: a living system keeps standing and keeps working, year after year, because the money and the care do not stop. Reliability is what the customer gets. Continuity is what can be funded.

A utility already pays when the land above it stops working: treatment for dirtier water, dredging for sediment, replacement supply when the source falls short. [The cheapest water you'll never build](/guide/water-utility-drought-risk-mitigation?from=guide), [water infrastructure moves water](/guide/water-infrastructure-moves-water?from=guide) and [who pays to keep natural infrastructure working](/guide/who-pays-to-keep-natural-infrastructure-working?from=guide) cover that side.

## what funding continuity looks like

In ensurance, a place can have an account addressed to it, which receives and holds money for that place. People fund it by holding a certificate, a public record of the funding: a **line** for something many people depend on, like a river or a region, with no title needed, or a **policy** for a titled natural asset with a cooperating owner ([natural assets](/manual/natural-assets?from=guide)). The people who depend on a watershed, a utility among them, could invest in it that way.

Two things differ from a capacity payment. A rule can be written before a season to pay more when a baseline holds or a reading improves ([parametric ensurance](/guide/what-parametric-ensurance-actually-does?from=guide)); the reading landing on the account is being wired, and no reading has moved money yet. And money already routed to a place's account is not taken back when a reading falls ([proceeds](/proceeds?from=guide)). A penalty fits a machine its owner can repair. A dry year is not a watershed's failure to perform.

None of this is a guarantee; a funded watershed can still burn or run dry. This is education, not investment, insurance or legal advice. For the road and bridge version of this idea, see [what an availability payment pays for](/guide/what-an-availability-payment-pays-for?from=guide).

If you plan for a utility and can name the watershed your supply or your hydro depends on, and what would have to keep working there, [tell us about it](/contact?from=guide&topic=continuity).

## frequently asked questions

### what is a capacity payment?

Money paid to a power plant, or to a customer who can cut demand, for being able to deliver when the grid is short, whether or not it runs.

### what is the difference between a capacity payment and an energy payment?

An energy payment pays for electricity produced, in the energy markets that PJM says account for most of its total costs. A capacity payment pays for being able to produce when the system needs it.

### do capacity payments guarantee the lights stay on?

No. They buy a commitment backed by penalties: after Winter Storm Elliott, PJM resources faced about $1.8 billion in non-performance charges, later settled at $1.25 billion.

### can a watershed be paid like a power plant?

Not on the same terms, because a watershed cannot be dispatched or penalized into performing.

## sources

[PJM, Reliability Pricing Model](https://www.pjm.com/markets-and-operations/rpm): PJM's description of its capacity market. Read 2026-11-24.

[PJM news release, July 30, 2024](https://www.pjm.com/-/media/about-pjm/newsroom/2024-releases/20240730-pjm-capacity-auction-procures-sufficient-resources-to-meet-rto-reliability-requirement.pdf): what the Base Residual Auction buys and when; the share of total costs in the energy markets; 2025/2026 and 2024/2025 results.

[PJM news release, July 22, 2025](https://www.pjm.com/-/media/DotCom/about-pjm/newsroom/2025-releases/20250722-pjm-auction-procures-134311-mw-of-generation-resources-supply-responds-to-price-signal.pdf): 2026/2027 results; capacity as a relatively small portion of retail bills.

[PJM news release, December 17, 2025](https://www.pjm.com/-/media/DotCom/about-pjm/newsroom/2025-releases/20251217-pjm-auction-procures-134479-mw-of-generation-resources.pdf): 2027/2028 results and the 6,623 MW shortfall.

[PJM news release, July 14, 2026](https://www.pjm.com/-/media/DotCom/about-pjm/newsroom/2026-releases/20260714-pjm-capacity-auction-procures-138318-mw-of-generation-resources.pdf): 2028/2029 results, the UCAP definition, the 6,831 MW shortfall and PJM's caution.

[PJM, 2026 Effective Load Carrying Capability and Reserve Requirement Study, October 30, 2026](https://www.pjm.com/-/media/DotCom/planning/res-adeq/elcc/2026-pjm-elcc-rrs.pdf): the one-occurrence-in-ten-years standard.

[Cramton, Ockenfels and Stoft, "Capacity Market Fundamentals," May 26, 2013](https://www.econ.umd.edu/sites/www.econ.umd.edu/files/pubs/cramton-ockenfels-stoft-capacity-market-fundamentals.pdf): missing money, inflexible demand, and the two approaches.

[ISO Newswire, June 11, 2018](https://isonewswire.com/2018/06/11/pay-for-performance-capacity-market-incentives-implemented-as-of-june-1-2018/): Pay for Performance and its start date.

[ISO New England, update to the Consumer Liaison Group, March 30, 2023](https://www.iso-ne.com/static-assets/documents/2023/03/clg_mtg_george_iso_new_england_update_ppt_mar_30_2023_final.pdf): the compensation rule.

[PJM, Winter Storm Elliott](https://www.pjm.com/markets-and-operations/winter-storm-elliott): event dates.

[PJM, Winter Storm Elliott settlement FAQ, December 20, 2023](https://pjm.com/-/media/markets-ops/winter-storm-elliott/ferc-settlement-faq.ashx): the FERC order, the charges before and after settlement, and bonus credits.

[Rudnick and Velásquez, "Learning from Developing Country Power Market Experiences: The Case of Colombia," World Bank Policy Research Working Paper 8771, March 2019](https://documents1.worldbank.org/curated/en/898231552316685139/pdf/WPS8771.pdf): the reliability charge, firm energy obligations and the 2015 to 2016 El Niño.

[Metropolitan Water District, Palo Verde fact sheet, March 2022](https://www.mwdh2o.com/media/12071/PVID-fact-sheet.pdf): the program's term and the fallowing call.

[PVID and Metropolitan term sheet, August 16, 2004](https://www.pvid.org/docs/MWDDocs/Term%20Sheet%20Program%20Agreement_v1.pdf): sign-up and annual payments per acre.

[U.S. Energy Information Administration, Today in Energy, March 30, 2022](https://www.eia.gov/todayinenergy/detail.php?id=51839): California hydropower and snowpack in 2021.

## the series

1. [what ensurance ensures](/guide/what-ensurance-ensures?from=guide)
2. [the supplier your continuity plan never names](/guide/the-supplier-your-continuity-plan-never-names?from=guide)
3. [what an availability payment pays for](/guide/what-an-availability-payment-pays-for?from=guide)
4. [you already pay power plants to stand ready](/guide/you-already-pay-power-plants-to-stand-ready?from=guide)
5. [a forest is a going concern](/guide/a-forest-is-a-going-concern?from=guide)
6. [keep it, bring it back, or let it rebuild itself](/guide/keep-it-bring-it-back-or-let-it-rebuild-itself?from=guide)
7. [permanence is promised. continuity is funded](/guide/permanence-is-promised-continuity-is-funded?from=guide)