---
title: when agricultural runoff reaches the water plant
canonical_url: https://ensurance.app/guide/when-agricultural-runoff-reaches-the-water-plant
markdown_url: https://ensurance.app/guide/when-agricultural-runoff-reaches-the-water-plant.md
subtitle: "one texas river, dairies upstream and a city's tap downstream. both have already spent on the same water, almost all of it at their own end"
category: ecosystem-services
---

# when agricultural runoff reaches the water plant

*one texas river, dairies upstream and a city's tap downstream. both have already spent on the same water, almost all of it at their own end*

For more than twenty years, a city in Central Texas has tasted agricultural runoff in its tap water. When algae bloom in Lake Waco they release geosmin, a compound that gives tap water an earthy taste and smell. The algae feed on phosphorus, and much of the phosphorus in the North Bosque River once came off fields where dairies spread manure. The City of Waco sued over it, then built a plant to take the taste back out. The dairies, for their part, have spent two decades under stricter permits, limiting manure by what each field's soil test allows, and sending manure out of the watershed.

Both ends of this river have paid for the same water.

:::johnson
**the same phosphorus costs both ends.** On the field it uses up the soil's room to take manure. In the lake it feeds the algae the city pays to filter out. The land between them is where it can be held.

[what source water protection already does for a utility →](/guide/what-source-water-protection-already-does-for-a-utility?from=guide)
:::

![photo by Luis Rodriguez (@luisroding) on unsplash](https://images.unsplash.com/photo-1717415856358-32eb467d8e5a?w=1200&fit=crop)

## agricultural runoff, in plain terms

### what is agricultural runoff?

**Agricultural runoff** is rain or irrigation water that runs off farm and ranch land and carries what was on that land with it: soil, fertilizer, manure, pesticides and bacteria. It has no single pipe. It comes off thousands of acres at once, mostly during storms.

The national picture is large. The EPA, citing the National Water Quality Assessment, says agricultural runoff is the leading cause of water quality impacts to rivers and streams, the third leading source for lakes, and the second largest source of impairments to wetlands. About 12 million tons of nitrogen and 4 million tons of phosphorus fertilizer go onto US crops each year, before any manure is counted.

### how does agricultural runoff affect drinking water?

Mostly through nutrients. Nitrogen and phosphorus that reach a reservoir feed algae. Algae change the taste and smell of the water, use up oxygen as they die, and some produce toxins. A utility that draws from that reservoir then pays to treat for it: more chemicals, more filtration, sometimes a whole new stage of treatment.

## one river, both ends: the north bosque and lake waco

*Everything below comes from public records, and none of the parties named is our client; if you are one of them, [contact us](/contact?from=guide&topic=when-agricultural-runoff-reaches-the-water-plant).*

The North Bosque River rises in Erath County, northwest of Stephenville. It runs about 110 river miles southeast, past Hico, Meridian, Clifton and Valley Mills, into Lake Waco in McLennan County. Its watershed covers 1,190 square miles of Cross Timbers, Grand Prairie and Blackland Prairie, mostly woodland, range and improved pasture. It makes up about 74% of the land draining into Lake Waco, which supplies drinking water to more than 150,000 people.

The upper third of that watershed is dairy country. Erath County was Texas's leading milk county from 1990 to 2010 and is still in the top six. In 2024 the watershed held about 30 dairies and an estimated 45,600 dairy cows, close to the roughly 45,000 of 2001.

In 2001 the state adopted two total maximum daily loads (TMDLs) for dissolved phosphorus on the river, approved by the EPA that December. A TMDL is a budget: how much of a pollutant a river can take and still meet its standards, divided among the sources. The goal here is an overall cut of about 50% in phosphorus, with reach-by-reach targets between 39% and 62%. The plan works on two kinds of source: municipal wastewater plants, and dairy manure (how much goes on each field, how much phosphorus is in the feed, and how much manure leaves the watershed).

## what each end has already spent

**The city.** In April 2004, Waco sued 14 dairies under the federal Superfund law (CERCLA) and the Clean Water Act. The city said phosphorus from manure was feeding the algae it had to treat for, and asked the dairies to pay those treatment costs. A federal judge let the claims proceed in March 2005, and seven of the 14 dairies had settled by that April; the rest of the record is in the court file. The city also built a pretreatment plant that floats algae off the raw water and treats it with ozone. It was finished in 2011, in a project that also raised the plant's capacity, at a reported $46 million to $55 million depending on what is counted.

The city also runs a wetland on the river. The Lake Waco Wetland, finished in 2003, is a 180-acre marsh that can hold 11 million gallons of river water for seven to ten days, filtering out some nutrients and sediment before the water returns to the river. A 2024 flood submerged its pumps and controls. In March 2026 the city was rebuilding them higher, with no date yet for the new pump.

**The dairies.** Since 2004, dairies in this watershed have needed individual permits with stricter nutrient rules than most of Texas. By 2010, all 55 permitted dairies operating in 2004 had certified nutrient management plans. The state samples the soil on their waste application fields every year, and manure cannot go on a field whose soil phosphorus is above the limit. Two state projects paid haulers to take manure to composters and rebated state agencies that used the compost: by August 2006 more than 650,000 tons had been hauled to composters, and the compost shipped out took more than 1.48 million pounds of phosphorus out of the watershed, meeting the plan's goal of exporting about half the solid manure.

The result shows up on the map. Fields actively taking manure fell from 24,554 acres in 2000 to 13,979 acres in 2024, as fields high in phosphorus were retired from waste application. The same phosphorus that degrades Waco's raw water also uses up the dairies' own disposal land.

**The public.** By 2010, an NRCS study counted $4.55 million of EQIP conservation funding in the watershed since 1997, plus $1.7 million of Clean Water Act Section 319 funds and $4 million from a USDA Lake Waco and Bosque River initiative. The state still pays TIAER, at Tarleton State University in Stephenville, to monitor the river and report on it every year.

## what the public record shows now

The river has improved, and the record says so plainly. TIAER's 2025 trends report found decreasing phosphorus trends at all five index sites through 2024. The state's 2025 status report says the three lowest sites, nearest Lake Waco, have generally been at or near their targets since 2006, and that phosphorus below Stephenville fell by more than half after the city of Stephenville upgraded its wastewater plant in 2005. Lower down, phosphorus started falling in 1999, years before the wastewater upgrades; TIAER links that in part to poultry operations sending their litter to a composter from about 2000.

It is not finished. The uppermost site, above Stephenville in dairy country, does not meet its goal, and its decline is about 1% a year. From October 2023 to September 2024, concentrations at most sites rose slightly over the year before. Chlorophyll-a, the measure of algae in the water, is still above the state's screening levels in the monitored reaches.

The relationship is not finished either. In 2023 a bill to move Bosque dairies from individual permits to the general permit used elsewhere in Texas, HB 2827, passed the Texas House and was left in a Senate committee. The city said it wants to keep the individual permit in its watershed. In 2025, HB 3830 would have given permitted animal feeding operations in watersheds like this one a franchise tax credit for the cost of hauling manure out; it cleared a House committee and went no further.

### who pays when farm runoff reaches a city's water supply?

Today, three groups pay, each at its own end:

- **Ratepayers** pay for treatment: the pretreatment plant, the chemicals and the legal work.
- **Dairies** pay for compliance: permits, nutrient plans, manure handling under those permits, and land retired from manure.
- **Taxpayers** pay for cost-share and monitoring: EQIP, Section 319, the state's hauling incentives, and TIAER's record.

Phosphorus that leaves a field is a cost that lands on the water below it. Both ends have worked on it for twenty years. Waco is also a member of the Bosque River Coalition, a group of landowners, businesses and the city whose members put their own time and money into riparian restoration, habitat work and soil conservation advice in the watershed.

We found no public record of a standing yearly investment from the water budget in the land between the fields and the river. If there is one, [tell us](/contact?from=guide&topic=when-agricultural-runoff-reaches-the-water-plant). The city has a stake in that land.

## what a watershed line would fund

The living thing here is the river and the ground beside it: the soil that holds phosphorus, the grass and woody strips along the creeks that slow runoff down, and the river channel itself. It exists whether or not anyone buys a certificate. **ensurance** is a way for the people who depend on it to fund it.

A watershed line for this river does not exist yet. We are naming it as a suggestion: **`north bosque` under `clean-water.ensurance`**. It is coming soon. Anyone can [suggest it or second it](/specific/create?mode=suggest&agent=clean-water.ensurance&name=north%20bosque&from=guide), and a person creates it. The parent, [clean-water.ensurance](/clean-water.ensurance?from=guide), is live today.

For a water utility downstream of dairies or ranches, the offer is this. The exposure is money already spent on algae taste and odor: Waco's pretreatment project alone is reported at $46 million to $55 million. What we deliver is the "source watershed investment" use case on the [utilities page](/solutions/utilities?from=guide&topic=when-agricultural-runoff-reaches-the-water-plant): watershed and hydrology work, with the measuring drawn from the public record, then certificates on the watershed line. The work it funds is buffers and filter strips along creeks, cover and drawdown crops on fields retired from manure, and upland cover. The utility buys certificates on the line each year from a source-protection budget it has already approved. To talk it through, [contact us](/contact?from=guide&topic=when-agricultural-runoff-reaches-the-water-plant).

Nobody upstream is charged. The dairies are the people who can hold phosphorus on their land or carry it out, so their work is what a line would fund; they are not buyers. Prices for the assessment work are on the [services page](/services?from=guide).

**ensurance** is built and early, and new lines are added on request. A certificate's mint price goes to the account of the place it names. **ensurance** is not insurance and pays nothing after a loss.

## frequently asked questions

### would funding the land upstream have prevented lake waco's algae?

We can't say that, and the record doesn't either. The record shows phosphorus falling after many changes at once: wastewater upgrades, manure export, permits, poultry litter handling, and weather. A line on the watershed funds the land's condition from now on. It promises no saving at the plant.

### is manure phosphorus a pollutant or a fertilizer?

Both, depending on the dose. On a field that needs phosphorus, manure is fertilizer. On a field whose soil is already high in phosphorus, the extra runs off with the rain. That is why the soil limits on North Bosque fields matter, and why fields high in phosphorus have been retired from manure.

### does this change anyone's water rate or milk check?

**ensurance** sets no rate and asks for no rate change. A utility would buy certificates from a source-protection budget it has already approved, and nothing is taken from a dairy.

The whole supply line is in [what the beef and dairy supply chain runs on](/guide/what-the-beef-and-dairy-supply-chain-runs-on?from=guide); the buyer's side is in [dairy sustainability that reaches the land the milk comes from](/guide/dairy-sustainability-that-reaches-the-land?from=guide). On source protection, see [what source water protection already does for a utility](/guide/what-source-water-protection-already-does-for-a-utility?from=guide), [how a keystone parcel gets paid](/guide/how-a-keystone-parcel-gets-paid?from=guide) and [who pays to keep the soil on the land](/guide/who-pays-to-keep-the-soil-on-the-land?from=guide).

## sources

[EPA, "Nonpoint Source: Agriculture"](https://www.epa.gov/nps/nonpoint-source-agriculture): agricultural runoff as the leading cause of water quality impacts to rivers and streams, third for lakes, second for wetlands (National Water Quality Assessment); 12 million tons of nitrogen and 4 million tons of phosphorus fertilizer a year.

[TCEQ, "North Bosque River: Implementing a TMDL to Protect General Uses"](https://www.tceq.texas.gov/waterquality/tmdl/06-bosque.html): counties, segments, river course, the 1,190-square-mile watershed, soluble reactive (dissolved) phosphorus; TMDL adoption (February 9, 2001) and EPA approval (December 13, 2001).

[TCEQ, AS-204/24, "Status Report: Implementing TMDLs to Reduce Phosphorus," October 2025](https://www.tceq.texas.gov/downloads/water-quality/tmdl/north-bosque-river-narrative-criteria-06/as-204-24-bosque-river-status-report_final.pdf): reduction goals of 39% to 62%; individual dairy permits from 2004; nutrient plans for all 55 permitted dairies by 2010; annual soil sampling; more than 650,000 tons of manure hauled to composters and 1.48 million pounds of phosphorus exported by August 2006; trends and targets by site; chlorophyll-a above screening levels; the Lake Waco Wetland.

[TIAER for TCEQ, AS-216/24 (TR2504), "Assessment of Water Quality Trends for the North Bosque River Through 2024," August 2025](https://www.tceq.texas.gov/downloads/water-quality/tmdl/north-bosque-river-narrative-criteria-06/as-216-2024-bosque-river-trends-report-final.pdf): the overall goal of about 50%; river length, share of the Lake Waco drainage and population served; dairy and cow counts for 2024; trends at all index stations; poultry litter handling; active waste application field acres, 2000 to 2024.

[Dyke and others, "Modeling Nutrient Loads and Management Operations in the North Bosque Watershed," Texas AgriLife Research and USDA NRCS (CEAP), September 2010](https://blackland.tamu.edu/media/ckchisg0/the-north-bosque-11-08-2010-for-nrcs-final.pdf): EQIP, Section 319 and USDA initiative funding in the watershed.

[Environmental Law Reporter, the City of Waco's suit against dairy owners and operators, W.D. Tex. No. W-04-CA-118, March 29, 2005](https://www.elr.info/litigation/waco-city-v-schouten): CERCLA, Clean Water Act and state claims against dairy owners and operators allowed to proceed.

[Farm and Dairy, April 21, 2005](https://www.farmanddairy.com/?p=8499): seven of the 14 dairies sued in April 2004 settled; the city sought its treatment costs.

[Water & Wastes Digest, "City of Waco Water Quality & Quantity Improvements Project"](https://www.wwdmag.com/top-projects/article/10920579/city-of-waco-water-quality-quantity-improvements-project): the dissolved-air-flotation plant, $46 million, completed June 2011; geosmin from algae.

[WaterWorld, "Taste test," November 7, 2013](https://www.waterworld.com/municipal/technologies/article/16190702/taste-test-dissolved-air-flotation-pretreatment-washes-away-wacos-foul-taste-odor-problem): $55 million for the wider program of upgrades, engineering, testing and an access road; algae fed by nutrients from upstream dairies.

[KWTX, "Waco wetlands rebuild," March 2026](https://www.kwtx.com/2026/03/31/waco-wetlands-rebuild/): 2024 flood damage to the wetland's pumps and controls; the rebuild; no timeline for the new pump.

[Texas Legislature Online, HB 2827 (88th Legislature)](https://capitol.texas.gov/BillLookup/History.aspx?LegSess=88R&Bill=HB2827): engrossed in the House; referred to the Senate Natural Resources and Economic Development committee on May 12, 2023; last action.

[Texas Legislature Online, HB 3830 (89th Legislature)](https://capitol.texas.gov/BillLookup/History.aspx?LegSess=89R&Bill=HB3830): a franchise tax credit for hauling agricultural waste out of a major sole-source impairment zone; reported from House Ways and Means 12–0; last action May 14, 2025, placed on the House calendar.

[KWBU, December 4, 2024](https://www.kwbu.org/2024-12-04/waco-city-council-lays-out-legislative-goals-for-texas-89th-legislative-session): the city's aim to keep the individual permit in its watershed.

[City of Waco, "Bosque River Coalition"](https://www.waco-texas.com/Departments/Water-Division/Bosque-River-Coalition): members, including the city, and the coalition's riparian restoration and soil conservation work.

## the series

1. [what the beef and dairy supply chain runs on](/guide/what-the-beef-and-dairy-supply-chain-runs-on?from=guide)
2. [what the federal grazing fee pays for](/guide/what-the-federal-grazing-fee-pays-for?from=guide)
3. [dairy feed costs start in someone else's field](/guide/dairy-feed-costs-start-in-someone-elses-field?from=guide)
4. [when agricultural runoff reaches the water plant](/guide/when-agricultural-runoff-reaches-the-water-plant?from=guide)
5. [what agricultural lending is really secured by](/guide/what-agricultural-lending-is-really-secured-by?from=guide)
6. [what an agricultural conservation easement keeps, and who depends on it after](/guide/what-an-agricultural-conservation-easement-keeps?from=guide)
7. [dairy sustainability that reaches the land the milk comes from](/guide/dairy-sustainability-that-reaches-the-land?from=guide)
