# what an availability payment pays for

*a government pays a private partner for a road being open, whether or not anyone drives on it. the watershed behind the road is paid nothing for being there*

An **availability payment** is a regular payment a public agency makes to a private partner for keeping a finished facility open and working to an agreed standard, whether or not anyone uses it. The payment falls when a lane closes or a standard is missed. Traffic does not move it.

That idea is close to what we fund, and different in ways that matter.

A forested watershed above a highway keeps doing its work whether or not anyone pays for it, until the year it can't. [**ensurance**](/specific?from=guide) is one way the money and care that keep it going get paid for. It is not insurance, and it pays nothing after a loss ([ensurance vs insurance](/guide/ensurance-vs-insurance?from=guide)).

:::johnson
**paid for being there, not for being used.**

That is where an availability payment and a living system's funding meet.

[for infrastructure investors →](/solutions/infrastructure-investors?from=guide&topic=continuity)
:::

![photo by William Croucher (@croucher) on unsplash](https://images.unsplash.com/photo-1793939032930-dee09b01e92c?ixid=M3w4NjQwMjZ8MHwxfHNlYXJjaHw4fHxyb2FkJTIwdGhyb3VnaCUyMGZvcmVzdGVkJTIwdmFsbGV5fGVufDB8MHx8fDE3OTU1NTYxMzV8MA&ixlib=rb-4.1.0&w=1200&fit=crop&auto=format)

## what an availability payment is

The Federal Highway Administration's model contract guide defines it in one sentence: "Availability Payments are made, subject to appropriation, by the Department to the Developer in exchange for the continuous delivery of the Project in accordance with the performance requirements set forth in the Concession Agreement."

The Department is the public agency; the Developer is the private partner that builds, finances and then runs the facility. The International Monetary Fund puts it from the government's side: the government pays "by way of predetermined payments over the term of the contract for making the asset available."

The contrast is a toll road. There, the FHWA guide says, the developer takes demand risk: that traffic and toll revenue fall short of its projections. In an availability concession the developer "takes financial risk associated with performing the Work according to agreed performance metrics," and its "maximum possible revenue is fixed." Traffic changes what the road is worth to the public. It does not change what the developer can earn.

## how the money moves

The contract sets a ceiling and a way down from it. It "will set a maximum payment that may be earned if the Project is available at all times and meets all requirements," plus "a regime of deductions" for unavailability or missed requirements. The payment is "typically paid monthly in arrears," and FHWA's model formula indexes the maximum for inflation.

Deductions are weighted, so missing a requirement costs in proportion to how much it matters to the agency. FHWA's explainer names the kind of standard involved: lane closures, incident management, snow removal. The European PPP Expertise Centre (EPEC) calls the principle "No service, no fee": a shortfall "should lead automatically to proportionate deductions from the fee," and with no availability at all, that "may mean no payment."

FHWA's fact sheet gives the risk split. The private side carries most of the risk of design, construction, financing, operation and maintenance. The public side carries the long-term obligation to pay.

"The Term of an Availability Payment concession generally ranges from 30 to 40 years," the guide says, and it may be counted from substantial completion rather than financial close. At the end the facility goes back to the agency. In a handback period that generally starts five years before the term ends, the developer must show a specified "Residual Life" for each major long-life element, such as structural foundations, and repair what is not performing.

## one tunnel, by the numbers

The Port of Miami Tunnel in Florida, from FHWA's project profile:

| | Port of Miami Tunnel |
|---|---|
| Public sponsor | Florida Department of Transportation |
| Private partner | Miami Access Tunnel, LLC |
| Structure, as FHWA states it | Design-build-finance-maintain availability payment concession, 30 years |
| Annual payment | $32.479 million in 2009 dollars, adjusted for inflation |
| Deductions | Made when operation misses prescribed performance standards |

The trade publication IJGlobal describes the whole concession as 35 years. Either way, the state pays a set amount for a tunnel that is open and up to standard, however many vehicles use it, and less when it is not.

## why the public side pays this way

The agency wants the service without betting on usage. FHWA notes the structure can also sit alongside tolls when an agency wants to control toll rates and will accept the revenue risk. And, as the IMF puts it, the government "may not have to pay anything until the asset has been constructed and the service is being delivered."

The caution is just as well known. The payments are subject to appropriation, and the IMF counts them among the fiscal costs partnerships place on governments, warning that such deals "can be used to circumvent traditional limits on the deficit and debt."

## the road and the watershed behind it

The road is paid for being open. The watershed behind it is paid nothing for being there.

We have a word for what that watershed needs: **continuity**. It is our word, not an industry term. The living system keeps standing and keeps working, year after year, because the money and the care do not stop.

In one respect, money paid into a place through ensurance works like an availability payment: it pays for a thing being there and working, not for how much anyone uses it.

| | availability payment | continuity |
|---|---|---|
| What is paid for | A facility open and meeting the concession's performance requirements | A living system that keeps standing and working: its care and, where land is titled, the cost of the land itself |
| Who pays | A public agency, subject to appropriation | Anyone who chooses to invest in the place, starting with those who depend on it |
| What is measured | Unavailability and missed requirements, weighted by importance | Designed: the place's condition, read against a baseline written before a season |
| A bad reading | Deductions; with no availability, possibly no payment | Nothing already paid to the place is taken back; a rule can only add |
| The term | Generally 30 to 40 years, often counted from substantial completion | Open-ended: no end date. Funded year by year, for as long as people fund the place |
| At the end | Handback to the agency, with a specified residual life for major long-life elements | For a titled parcel with a consenting owner, entrust: protected for good, debt and claims cleared, so the money that arrives can go to care |
| Who built it | A private developer, to a specification, with private finance | Nobody. It grew, and it needs keeping |

## five places the likeness breaks

1. **Nobody built it to a specification.** A tunnel's standard and handback condition are written before construction. A watershed has only a condition worth keeping.
2. **There is no construction phase to finance.** An availability payment repays the capital that built the facility, which is why the guide says there must be enough payments to match the maturity of the debt. A living system already exists. Where land has to be bought or its debts cleared, money goes there first, and then to keeping it.
3. **A bad year is not fixed by changing who runs it.** A missed standard in a concession is a contract problem with a party who can repair the lane. Nobody can contract for rain.
4. **The people who depend on it are many and scattered.** One agency signs one concession. The land behind a road serves a utility, farms, towns and the road itself, and no single party signs for all of them.
5. **Money already paid is not deducted.** Taking money back from a struggling place removes care when it is needed most. A rule can be written before a season to pay more when a baseline holds or a reading improves ([parametric ensurance](/guide/what-parametric-ensurance-actually-does?from=guide)). The reading landing on the account is being wired. No reading has moved money yet.

So "works like an availability payment" is an analogy, and a useful one for an allocator; [how to underwrite natural infrastructure](/guide/underwrite-natural-infrastructure?from=guide) and [your liabilities are 30 years out](/guide/match-your-liabilities-to-living-systems?from=guide) use it that way. Continuity is the word for the living version: the one nobody built and nobody hands back.

## what funding continuity looks like

A place, a purpose or a species can have an **account** addressed to it that holds and receives money. People fund it by holding a **certificate**, a dated public record that they did: a line for something many people depend on, like a river or a region, or a policy for a titled natural asset with a cooperating owner ([natural assets](/manual/natural-assets?from=guide)). Where the money goes is written in public split contracts, and [proceeds](/proceeds?from=guide) shows it.

A funded watershed can still burn, flood or change. This is education, not investment, accounting or legal advice.

If you hold availability-based assets, you already value a thing for being there. The open question is which living system your asset depends on. [Natural infrastructure investment holds the living part](/guide/natural-infrastructure-investment-holds-the-living-part?from=guide) takes it further, and [paying power plants to stand ready](/guide/you-already-pay-power-plants-to-stand-ready?from=guide) is the grid's version of this idea. If a place comes to mind, [tell us which one](/contact?from=guide&topic=continuity).

## frequently asked questions

### what is an availability payment?

A regular payment from a public agency to a private partner for keeping a facility open and at an agreed standard, whether or not anyone uses it, with deductions when it falls short.

### who takes traffic risk in an availability payment deal?

Not the developer. FHWA's guide says a toll developer takes demand risk, while an availability developer's risk is performing to agreed metrics, with its maximum revenue fixed.

### is an availability payment debt?

The IMF counts availability payments among a partnership's fiscal costs to government and warns that partnerships can be used to get around deficit and debt limits. How a given payment is recorded depends on the accounting rules that apply to it.

### can natural infrastructure be paid on availability?

We could not verify a living system paid this way. The stormwater partnership we checked, Prince George's County's Clean Water Partnership in Maryland, pays its manager under its 2015 master program agreement by reimbursing costs plus a base fee and incentive fees. That agreement contains no availability payment.

## sources

[FHWA, Availability Payment Concessions Public-Private Partnerships Model Contract Guide (draft, September 2015)](https://www.fhwa.dot.gov/ipd/pdfs/p3/apguide.pdf): definition, maximum payment and deductions, weighting, inflation indexing, demand risk, fixed revenue, term, handback

[FHWA Center for Innovative Finance Support, DBFOM availability payment concessions](https://www.fhwa.dot.gov/ipd/p3/defined/new_build_facilities/dbfom_availability_payment_concessions.aspx): example performance standards; use alongside tolls

[FHWA, Availability Payments fact sheet](https://www.fhwa.dot.gov/ipd/fact_sheets/availability_payments.aspx): the public and private risk split

[FHWA project profile, Port of Miami Tunnel](https://www.fhwa.dot.gov/ipd/project_profiles/fl_port_miami_tunnel.aspx): sponsor, partner, term, annual payment, deductions, dates

[IJGlobal, Port of Miami Tunnel: digging deep](https://infrastructure.greenstreet.com/articles/108412/port-of-miami-tunnel-digging-deep): 35-year concession

[EPEC, Availability-based Payment Mechanisms for PPP Schools Projects (February 2020)](https://www.eib.org/attachments/epec/epec_availability_payment_mechanisms_in_ppp_schools_projects_en.pdf): "No service, no fee"

[IMF, How to Control the Fiscal Costs of Public-Private Partnerships, How-to Note 18/04 (2018)](https://www.imf.org/-/media/files/publications/howtonotes/howtonote1804.pdf): government-funded partnerships, timing of payment, fiscal costs, deficit and debt limits

[Prince George's County and Corvias, Clean Water Partnership Master Program Agreement (March 2015)](https://www.cheverly-md.gov/DocumentCenter/View/1215/CORVIUSClean-Water-Partnership---Master-Program-Agreement): payment basis

## the series

1. [what ensurance ensures](/guide/what-ensurance-ensures?from=guide)
2. [the supplier your continuity plan never names](/guide/the-supplier-your-continuity-plan-never-names?from=guide)
3. [what an availability payment pays for](/guide/what-an-availability-payment-pays-for?from=guide)
4. [you already pay power plants to stand ready](/guide/you-already-pay-power-plants-to-stand-ready?from=guide)
5. [a forest is a going concern](/guide/a-forest-is-a-going-concern?from=guide)
6. [keep it, bring it back, or let it rebuild itself](/guide/keep-it-bring-it-back-or-let-it-rebuild-itself?from=guide)
7. [permanence is promised. continuity is funded](/guide/permanence-is-promised-continuity-is-funded?from=guide)