---
title: what a hydropower operator can invest in above the dam
canonical_url: https://ensurance.app/guide/what-a-hydropower-operator-can-invest-in-above-the-dam
markdown_url: https://ensurance.app/guide/what-a-hydropower-operator-can-invest-in-above-the-dam.md
subtitle: "a water-and-power utility already budgets for forest work above its reservoirs. here is how a utility, a generator and the companies that buy their power can put that budget into the watershed as an investment, and report it each year"
category: nature-finance
---

# what a hydropower operator can invest in above the dam

*a water-and-power utility already budgets for forest work above its reservoirs. here is how a utility, a generator and the companies that buy their power can put that budget into the watershed as an investment, and report it each year*

**Hydropower watershed management** is the work done on the land above a dam: the forest, grass and soil that catch rain and snow, release it to the river over weeks and months, and keep sediment on the slope instead of in the reservoir. The operator holds the dam, the licence, the water right and the power sale. The land above is usually held by others: a national forest, a Tribe, a state, ranchers and other private owners. They are the ones who keep it.

Some operators already put money into that land. A water-and-power utility in Arizona budgets for forest thinning above its reservoirs and collects money from customers and companies for the same work. Two hydro companies in Costa Rica paid landowners above their plants to protect forest. Colombia and Brazil move a share of hydro revenue by statute to the governments and authorities around the reservoir. This post sets out what exists. Then it shows how a utility can invest in the watershed and report it each year. A generator and the companies that buy its power can do the same.

:::johnson
**you have a stake in the watershed above the dam.** A forest budget you already plan can go into a named watershed as an investment, counted in certificates per year, on a public record.

[start with the free exposure map →](/exposure?sector=Energy-Power&from=guide)
:::

![photo by Peter Chapin (@peterandjudy) on unsplash](https://images.unsplash.com/photo-1642681925130-4b1a36d53161?w=1200&fit=crop)

## what hydropower watershed management covers

A reservoir fills from what its watershed spills: snowmelt, rain, baseflow from soil and groundwater. How a dam turns that water into power is in [how hydropower works](/guide/how-hydropower-works?from=guide). What the watershed sends, and what it holds back, depends on the condition of the land. A healthy forest and intact soil slow runoff. After a severe fire, ash and soil can wash downhill into the reservoir, and storage lost to sediment is hard to get back ([reservoir sedimentation](/guide/reservoir-sedimentation?from=guide) covers how much).

So watershed management for hydropower is mostly land work. It includes forest thinning and prescribed fire, post-fire erosion control, keeping riparian strips and forest cover on steep ground, and monitoring the results. The operator rarely does it alone, because the operator rarely holds the land.

## one water-and-power utility's forest budget

Salt River Project (SRP) delivers water and power in central Arizona. Its own pages lay out the dependency plainly. The water "comes from rainfall and snowmelt across 8.3 million acres of forest in northern and eastern Arizona." Since 2000, "more than 3.5 million acres of forests in or around the Salt, Verde and East Clear Creek watersheds" have burned, and "the debris from wildfires settles at the base of the dams, reducing reservoir capacity."

SRP holds its dams. The forest its water starts on is held by others: its watershed page names the national forests, and private, state, tribal and Bureau of Land Management land.

What SRP already spends and gathers, from its own pages:

- **Customers.** The Healthy Forest Initiative lets customers add "as little as $3 per bill"; the full donation goes to forest thinning, and SRP matches "every dollar contributed by our customers up to $200,000 per year."
- **A forest partner.** In February 2024 SRP signed a five-year agreement with the National Forest Foundation: "$500,000 per year" for forest restoration projects, plus $25,000 a year to the foundation's Wood for Life program, which gives firewood from restoration work to Indigenous communities. The first projects were in the Tonto National Forest.
- **Companies.** SRP's Resilient Water and Forest Initiative takes donations from businesses for thinning projects in its watersheds, with annual reporting. Its business page shows Google, Meta, Pepsi and EdgeCore under "corporate partners." In November 2023 SRP announced that EdgeCore, a data-center developer in Mesa, had given $288,419 toward restoring nearly 5,000 acres north of Payson, and said the gift would count toward "water-neutral" status for its Mesa campus until 2036, in EdgeCore's own terms.
- **A goal.** SRP's goal is to "strategically thin 800,000 acres of overgrown forests by 2035." SRP's February 2024 release gave the same goal as 500,000 acres.

SRP and the companies named here are not our clients; if you are one of them, [talk to us](/contact?from=guide&topic=what-a-hydropower-operator-can-invest-in-above-the-dam).

## what already reaches the watershed above a dam

SRP is one shape. Others are on the public record. From 1999 the Platanar hydro company in Costa Rica paid US$30 per hectare per year through the national forest fund FONAFIFO to 26 landowners protecting or replanting 1,226 hectares, and Energía Global paid $12 per hectare per year from 1997, about US$400,000 over two contracts; neither record shows effects on the water ([reservoir sedimentation](/guide/reservoir-sedimentation?from=guide) has both). Colombia's Law 99, article 45, has hydro generators above 10,000 kW transfer 6% of gross energy sales, half to the environmental authorities or national parks over the watershed and half to its municipalities. Brazil pays 6.25% compensation to the states and municipalities whose land is affected by reservoirs, plus 0.75% to the national water-resources policy. These statutes move money to the governments around a reservoir. None is a dependent choosing to invest in the forest above the dam, which is what the rest of this post is about.

## watershed investment for hydropower

**Watershed investment for hydropower** means the people who depend on a dam's water and power put money into a named watershed's line, before a failure, from a budget they already have, and report it each year. A line is a named watershed account people can fund, which a person creates on request. It is not a capacity payment: [a capacity payment](/guide/you-already-pay-power-plants-to-stand-ready?from=guide) buys a plant's readiness to run, while a certificate here funds work on the watershed's condition.

The service is "source watershed investment" on our [page for utilities](/solutions/utilities?from=guide&topic=what-a-hydropower-operator-can-invest-in-above-the-dam). In the page's words, a utility holds certificates on headwater watershed agents and reports them as watershed restoration partnerships; certificate proceeds fund riparian restoration and forest health upstream of the intake. The use case is written for a water intake. SRP's program is an example of where this could fit, because SRP sells water as well as power. For a generator that sells only power, the fit is partial: the page names reservoir sedimentation and wildfire as threats to hydro capacity, but its use case is the water intake.

| who | what the public record shows | what we offer | the work it funds | the unit |
|---|---|---|---|---|
| A water-and-power utility (SRP) | More than 3.5 million acres burned in or around its watersheds since 2000; debris that reduces reservoir capacity; $500,000 a year to a forest partner; customer donations matched up to $200,000 a year | Source watershed investment; certificates on a suggested Salt and Verde headwaters line | Forest thinning and post-fire erosion control in the Salt, Verde and East Clear Creek watersheds, with the monitoring the work already needs | Certificates on that line bought per year, from the forest budget SRP already plans |

Two roles have the same shape but no public number yet: a hydro generator on a cascade, from a catchment budget it chooses to open, and a company that buys the power, through supply chain resilience on our [page for corporations](/solutions/corporations?from=guide&topic=what-a-hydropower-operator-can-invest-in-above-the-dam), from the water-stewardship budget it already funds.

### the line, named by place

The parent account, [water-abundance.ensurance](/water-abundance.ensurance?from=guide), exists. The Salt and Verde headwaters line is a suggestion; it has not been created yet. It can be named and co-created: [suggest the salt and verde headwaters line](/specific/create?mode=suggest&agent=water-abundance.ensurance&name=salt%20and%20verde%20headwaters&from=guide). If your dam sits on another river, [name your own watershed](/specific/create?mode=suggest&agent=water-abundance.ensurance&from=guide).

A certificate funds the named place's line and sits on a public record; its value can rise or fall. What it adds beyond a thinning donation is a public record of who funded which place, tied to that place's account. **ensurance** is not insurance and pays nothing after a loss.

The work it funds is done by the people who hold and tend the land: landowners, Tribes and the forest agencies.

## three steps from a budget you already plan

The method is the one in [how to fund the source your supply chain depends on](/guide/how-to-fund-the-source-your-supply-chain-depends-on?from=guide), applied to a watershed above a dam.

| step | what you do | cost |
|---|---|---|
| 1. read | Open the [exposure map for energy and power](/exposure?sector=Energy-Power&from=guide) to see which flows from nature the sector depends on | no charge |
| 2. locate | Name your reservoirs and intakes; we report what the watershed above each one provides, its condition and who else depends on it | a published price on [our services page](/services?from=guide) |
| 3. fund | Buy certificates on the named watershed line each year, from the budget you already set for forest work or water stewardship | your choice of amount |

Where land has to be secured or restored in one piece, a two-sided blended model is designed for that: investors front the cost, and the people who depend on the place invest over time. No source has run it yet ([the investor's side](/guide/the-shortest-asset-in-the-book-stands-on-the-longest?from=guide)).

If your load runs on river-cooled power as well as hydro, [how much water a power plant uses](/guide/power-plant-water-use?from=guide) sets out the other river edge. For every source in the mix, start at [where your electricity comes from](/guide/where-does-electricity-come-from?from=guide).

## frequently asked questions

### how do hydropower companies protect their watersheds?

In the cases read here, mostly through land work on ground they do not hold: forest thinning, post-fire erosion control and keeping forest cover on steep slopes, done with the agencies and owners who hold the land. Some fund it from their own budgets and customer donations, as SRP does; some have paid landowners directly, as two Costa Rican companies did; in Colombia and Brazil a share of hydro revenue moves by statute.

### what is watershed investment for hydropower?

It is money from the people who depend on a dam, put into a named watershed's line before a failure and reported each year. Here it takes the form of certificates on a line for the watershed, bought from a forest or water-stewardship budget the buyer already has.

### what already reaches the watershed above a dam?

In the cases read here: SRP's forest budget, customer donations and company gifts; two Costa Rican contracts with landowners from the late 1990s; and statutory transfers in Colombia and Brazil to the authorities and municipalities around the reservoir.

### how would a company that buys hydropower report it?

As a count: certificates bought, per watershed, per year, on a public record. The entry reads as what you funded, where and how much. A utility can report the same holding as a watershed restoration partnership.

If you run a hydro plant or buy its power, [start with the free exposure map for energy and power](/exposure?sector=Energy-Power&from=guide).

## the series

1. [where your electricity comes from, and the land and water under each source](/guide/where-does-electricity-come-from?from=guide)
2. [how hydropower works, starting with the watershed above the dam](/guide/how-hydropower-works?from=guide)
3. [reservoir sedimentation: the storage a dam loses to the slopes above it](/guide/reservoir-sedimentation?from=guide)
4. [what the land and water conservation fund is, and the offshore revenue behind it](/guide/what-the-land-and-water-conservation-fund-is?from=guide)
5. [how much water a power plant uses, and the river that cools it](/guide/power-plant-water-use?from=guide)
6. [what a hydropower operator can invest in above the dam](/guide/what-a-hydropower-operator-can-invest-in-above-the-dam?from=guide)

## sources

[SRP, Protect Arizona's forests and water supply](https://www.srpnet.com/trees) — water from 8.3 million acres of forest; Healthy Forest Initiative from $3 per bill, matched up to $200,000 a year; goal of 800,000 acres thinned by 2035 (read 27 November 2026)

[SRP, Watershed](https://www.srpnet.com/grid-water-management/water-management/watershed) — more than 3.5 million acres burned since 2000; wildfire debris at the base of the dams; land held by national forests, private, state, tribal and BLM owners (read 27 November 2026)

[SRP media release, National Forest Foundation and SRP partner to improve watershed and forest health in northern Arizona](https://media.srpnet.com/national-forest-foundation-and-srp-partner-to-improve-watershed-and-forest-health-in-northern-arizona/) — 14 February 2024: five years, $500,000 a year, plus $25,000 a year to Wood for Life; then a 500,000-acre goal

[SRP, Resilient Water and Forest Initiative for businesses](https://www.srpnet.com/account/donate/commercial-healthy-forest) — business donations to forest projects, annual reporting, corporate partners shown (read 27 November 2026)

[SRP media release, EdgeCore Digital Infrastructure and SRP partner to improve Arizona watershed and forest health](https://media.srpnet.com/edgecore-digital-infrastructure-and-srp-partner-to-improve-arizona-watershed-and-forest-health/) — 15 November 2023: $288,419 toward nearly 5,000 acres north of Payson; water-neutral until 2036 by the company's definition

[Watershed Markets, Platanar case study](https://watershedmarkets.org/casestudies/Costa_Rica_Platanar.html) — 1999, renewed 2004; US$30 per hectare per year via FONAFIFO; 26 landowners, 1,226 ha; effects on water not monitored

[Watershed Markets, Energía Global case study](https://watershedmarkets.org/casestudies/Costa_Rica_Energia_Global.html) — from 1997, renewed 2003; $12 per hectare per year via FONAFIFO; US$400,000 over two contracts; no data on water-service gains

[Ley 99 de 1993, artículo 45, as amended by Ley 1930 de 2018](https://normas.cra.gov.co/gestor/docs/ley_0099_1993.htm) — hydro generators above 10,000 kW transfer 6% of gross energy sales: 3% to regional environmental authorities or national parks with jurisdiction over the watershed, including páramo conservation; 3% to the municipalities of the watershed and the reservoir (read 27 November 2026)

[ANEEL, Compensação financeira: aspectos legais](https://www.gov.br/aneel/pt-br/assuntos/geracao/compensacao-financeira/aspectos-legais) — compensation to states and municipalities affected by hydro reservoirs; 6% to 6.25% (Lei 13.360/2016); 65% municipalities, 25% states (Lei 13.661/2018); 0.75% to the national water-resources policy, now distributed to the national water agency (read 27 November 2026)
