# reservoir sedimentation: the storage a dam loses to the slopes above it

*two costa rican hydro companies paid landowners above their plants to protect forest on the slope. neither case records what it did to the water*

Reservoir sedimentation is the sand, silt and clay a river carries settling out behind a dam, filling the reservoir from the bottom up. Every acre-foot of sediment that settles there is an acre-foot of storage the dam no longer has for water. Across the world's large dams, one study estimates the loss at 13% to 19% of their original storage so far.

The soil starts on the slopes above. Forest, grass, roots and leaf litter hold it in place, and the people who keep that cover (landowners, Tribes, forest agencies) are doing work the reservoir below depends on. A river always carries some sediment. The dam is where it stops.

:::johnson
**the operator holds the dam and its storage. the soil that fills it starts on the slopes above.**

In the two Costa Rican cases below, the forest above the plants was held by landowners who signed contracts with the operators.

[where the water for your power starts →](/guide/how-hydropower-works?from=guide)
:::

![photo by Ilia (@swipt) on unsplash](https://images.unsplash.com/photo-1774779622619-3375d14e2328?w=1200&fit=crop)

## what reservoir sedimentation is

### what is reservoir sedimentation?

A river moving fast carries sediment. When it reaches a reservoir it slows, and what it carried settles to the bed. Over years that sediment takes up room meant for water: storage for irrigation, for a city, for the turbines, and for holding back a flood.

It costs an operator in more than storage. Abrasive sediment that reaches the machinery can wear hydroelectric turbines and other parts, lowering efficiency and raising maintenance costs (UN University, 2023). Sediment also clogs intakes; the steps for clearing one are in [how to stop sediment clogging a water intake after storms](/guide/how-to-stop-sediment-clogging-a-water-intake-after-storms?from=guide).

### where does reservoir sediment come from?

From the land above, through the streams that drain it. How much comes off depends on what covers the ground: a slope under forest or grass gives up less soil than one left bare, and a burned slope can send down ash and debris. The argument that sediment is a cover problem first is made in [you don't have a sediment problem, you have missing cover](/guide/you-dont-have-a-sediment-problem-you-have-missing-cover?from=guide).

One US operator says it in its own words. Salt River Project, a not-for-profit water and power utility in Arizona, writes on its watershed page that "the debris from wildfires settles at the base of the dams, reducing reservoir capacity and affecting water quality." What SRP funds in its forests is in [what a hydropower operator can invest in above the dam](/guide/what-a-hydropower-operator-can-invest-in-above-the-dam?from=guide).

## how much storage the world's dams have lost

### how much storage have the world's dams lost to sediment?

The best global figures are model estimates, not survey results. Researchers at UN University's Institute for Water, Environment and Health took storage loss rates from earlier studies and applied them to 47,403 large dams in 150 countries whose original capacity and construction year are known. The paper, by Perera, Williams and Smakhtin, appeared in *Sustainability* (2022); the university announced it in January 2023.

| figure | what it measures | source |
|---|---|---|
| About 50,000 large dams | Dams over 15 m high, or 5–15 m holding over 3 million m³ | UNU release |
| 13% to 19% | Estimated share of original storage already lost, across major regions | Paper and release |
| 23% to 28% | Projected share lost by 2050 | UNU release |
| About 0.36% a year | Estimated average annual loss of initial capacity; the authors say it may be conservative | UNU release |
| 0.5% to 1% a year | The range of earlier estimates | UNU release |
| 35% to 50% by 2050 | Highest projected losses: Seychelles, Japan, Ireland, Panama, United Kingdom | Paper abstract |

Each dam's real rate depends on its river and the land above it. The authors' own point is that "the newly built dams will not be able to offset storage losses to sedimentation." They also say more basin-wide sediment monitoring and more frequent reservoir surveys would sharpen the numbers.

For one reservoir, the useful number is local: its most recent bathymetric survey set against its original design capacity.

### what can an operator do about a silting reservoir?

The UN University release sets out the options at the dam itself. Each has a cost.

| option | what it does | the catch |
|---|---|---|
| Dredging | Digs sediment out | Costly, and only temporary |
| Flushing | Opens the dam to wash sediment through | Cheaper, but can have significant downstream impacts |
| Bypass tunnel | Routes high-flow, sediment-heavy water around the reservoir | Can cut sedimentation by 80% to 90% when run optimally |
| Raising the dam | Recovers lost storage | Needs a structural assessment; can displace communities and habitat |
| Removal | Restores the river's natural sediment transport | Stored sediment may hold heavy metals and toxins |

All five work on sediment that has already left the slope. The other place to work is the slope itself, and that is where two Costa Rican hydro companies put money.

## what two hydro companies paid for above their plants

In Costa Rica, two hydropower companies paid landowners above their plants to protect and replant forest, through FONAFIFO, the national forestry fund. How Costa Rica's national programme is funded is covered in [what payment for ecosystem services actually is](/guide/what-payment-for-ecosystem-services-actually-is?from=guide). The numbers below are from their case pages, for the years 1997 to 2005.

**Platanar.** The Platanar hydroelectric company funded forest protection in the high and upper-middle parts of the Río Platanar watershed, 3,655 hectares in all. FONAFIFO paid the landowners its standard rates. The case page: "effects on water quantity (or quality) are not monitored."

**Energía Global.** Energía Global runs two run-of-the-river plants, PH Don Pedro (12 MW) and PH Río Volcán (17 MW), serving 40,000 users. FONAFIFO topped up its payments from national funds and kept 5% for overhead. The target was more than 4,000 hectares; land-use monitoring showed 217 more hectares of forest. On the company's claimed gains in water, the case page says "there is no data to support improvements in the water services."

| | Platanar | Energía Global |
|---|---|---|
| Started | 1999 for five years, renewed 2004 | 1997, renewed April 2003 |
| Paid through FONAFIFO | US$30 per ha per year | US$12 per ha per year, plus US$2 from 2003 |
| Land under contract | 1,226 ha, 26 landowners (24 protection and 2 reforestation contracts) | Over 1,400 ha, 31 households (2005) |
| Money in | US$85,000 by 2003 | US$400,000 over two five-year contracts |
| Water effects measured | Not monitored | No data |

This comes from public records, and none of these companies is our client: if you are one, [talk to us](/contact?from=guide&topic=reservoir-sedimentation).

### what reaches the slope above a reservoir today?

Three kinds of money reach the slopes above the reservoirs in this post. Hydro companies' own contracts with landowners, as in Costa Rica. A utility's match: SRP matches its customers' donations for forest thinning, up to $200,000 a year. And public programmes that pay landowners for forest, such as Costa Rica's.

## frequently asked questions

### does reservoir sedimentation only affect hydropower?

No. Any dam that stores water loses room to sediment: supply reservoirs, irrigation reservoirs and flood-control dams as well as hydro. Hydro adds turbine wear to the lost storage. How a hydro dam fills and what it depends on is in [how hydropower works](/guide/how-hydropower-works?from=guide).

### can a reservoir get its lost storage back?

Partly, at a cost. Dredging removes sediment for a time; raising the dam adds room; removal ends the reservoir. A bypass tunnel slows the next round of filling. None of them changes what leaves the slope.

### did the costa rica payments reduce sediment?

The case pages do not say. Platanar's page records that effects on water were not monitored, and Energía Global's that there is no data behind claimed water gains. They record forest protected and replanted.

## the slope, the storage, and who depends on both

The operator holds the dam and its storage. Whoever owns the land above holds the slope.

If you depend on a reservoir, you can fund forest and ground-cover work on the slope above it by buying a certificate on a line for that watershed under [Erosion Control](/erosion-control.ensurance?from=guide), an account on **ensurance**; if your watershed has no line yet, you can [suggest one](/specific/create?mode=suggest&agent=erosion-control.ensurance&from=guide). Neither Costa Rica case measured whether such work lowered sediment.

A certificate funds that line's work and is listed publicly. Its value can go up or down. **ensurance** is not insurance and pays nothing after a loss.

If you run a utility or a hydro plant, the [utility view](/solutions/utilities?from=guide&topic=reservoir-sedimentation) covers paying for the land above your intake. If you hold land above a reservoir, see [what a landowner can do](/solutions/landowners?from=guide&topic=reservoir-sedimentation).

If you run a hydro plant or depend on one, read next [what a hydropower operator can invest in above the dam](/guide/what-a-hydropower-operator-can-invest-in-above-the-dam?from=guide).

## the series

1. [where your electricity comes from, and the land and water under each source](/guide/where-does-electricity-come-from?from=guide)
2. [how hydropower works, starting with the watershed above the dam](/guide/how-hydropower-works?from=guide)
3. [reservoir sedimentation: the storage a dam loses to the slopes above it](/guide/reservoir-sedimentation?from=guide)
4. [what the land and water conservation fund is, and the offshore revenue behind it](/guide/what-the-land-and-water-conservation-fund-is?from=guide)
5. [how much water a power plant uses, and the river that cools it](/guide/power-plant-water-use?from=guide)
6. [what a hydropower operator can invest in above the dam](/guide/what-a-hydropower-operator-can-invest-in-above-the-dam?from=guide)

## sources

[UN University (UNU-INWEH), "Trapped Sediment Robbing World's Large Dams of Vital Water Storage Capacity", press release, 11 January 2023](https://unu.edu/press-release/trapped-sediment-robbing-worlds-large-dams-vital-water-storage-capacity) — about 50,000 large dams; an estimated 13% to 19% of combined original storage lost, 23% to 28% by 2050; loss rates applied to 47,403 ICOLD dams in 150 countries; average annual loss about 0.36% of initial capacity, possibly conservative, against earlier estimates of 0.5% to 1%; large-dam definition; turbine abrasion; dredging, flushing, bypass tunnels (80% to 90% at optimal operation), raising dams and removal; call for basin-wide monitoring and more frequent bathymetric surveys. A modelled estimate.

[Perera, Williams and Smakhtin, "Present and Future Losses of Storage in Large Reservoirs Due to Sedimentation: A Country-Wise Global Assessment", *Sustainability* 15(1): 219 (2022), abstract](https://econpapers.repec.org/RePEc:gam:jsusta:v:15:y:2022:i:1:p:219-:d:1012603) — 47,403 large dams in 150 countries; 6,316 billion m³ of initial storage falling to 4,665 billion m³, a 26% loss by 2050; 13% to 19% already lost by major regions; Seychelles, Japan, Ireland, Panama and the United Kingdom 35% to 50% by 2050; "the newly built dams will not be able to offset storage losses to sedimentation"

[Watershed Markets, "Platanar, Costa Rica" case study](https://watershedmarkets.org/casestudies/Costa_Rica_Platanar.html) — agreement 1999 for five years, renewed 2004; 26 landowners; 3,655 ha watershed; 26 contracts on 1,226 ha (24 protection, 2 reforestation); US$30/ha/yr to FONAFIFO; US$85,000 invested to 2003; "effects on water quantity (or quality) are not monitored"

[Watershed Markets, "Energía Global, Costa Rica" case study](https://watershedmarkets.org/casestudies/Costa_Rica_Energia_Global.html) — PH Don Pedro 12 MW and PH Río Volcán 17 MW, run-of-the-river, 40,000 users; from 1997, renewed April 2003; US$12/ha/yr to FONAFIFO plus US$2 from 2003; 5% FONAFIFO overhead; US$400,000 over two five-year contracts; target over 4,000 ha; over 1,400 ha and 31 households by 2005; 217 ha more forest; "there is no data to support improvements in the water services"

[Salt River Project, watershed page](https://www.srpnet.com/grid-water-management/water-management/watershed) — "the debris from wildfires settles at the base of the dams, reducing reservoir capacity and affecting water quality"; read 27 November 2026

[Salt River Project, Healthy Forest Initiative](https://www.srpnet.com/trees) — customer donations to thinning, matched by SRP up to $200,000 a year; water from forest in northern and eastern Arizona; read 27 November 2026